Step 7 of 7
Your pack is ready.
Read the evidence PDF through before you submit it. The ZIP holds the evidence PDF and every exhibit, named in order and ready to submit. It also holds your guide to submitting, step by step, which stays with you.
- 14 pages
- 15 exhibits
- Version 14, built Saturday 17 October 2026
TenancyVaults prepares your evidence and doesn’t give legal advice. You check the pack and submit it yourself.
How to submit to DPS
Evidence due by Friday 4 December 2026
- 1Sign in to your DPS account, open View tenancies and choose Submit evidence, then Upload evidence.
- 2Paste the landlord’s statement into the Additional information box. It is 886 of 1,000 characters.
Additional information
Tenancy of Flat 2, 14 Albion Road, Bristol, BS3 4AB, from 1 September 2024 to 31 August 2026; deposit £1,500.00 held by DPS (custodial). Total claimed: £553.33. £946.67 of the deposit goes back to the tenant. 1. Lounge carpet replacement: £213.33 (cost £640.00, reduced for age). Check-in records the carpet as very good with no burns [E1]; check-out records two burn marks [E2], shown in [E5]. Quote: £640.00 [E6]. 2. Lounge carpet stain treatment: £95.00. Check-out records a red wine stain [E2]; invoice £95.00 [E8]. 3. Picture glass replacement: £35.00. Glass cracked at check-out [E2] [E10]; invoice £35.00 [E11]. The tenant agreed to this deduction [E15 p1]. 4. Lounge walls redecoration: £210.00 (cost £420.00, reduced for age). Check-in records no marks [E1]; check-out records scuffs [E2] [E13]. Quote £420.00 [E14]. The tenant says the marks are normal wear from the sofa.
- 3Upload the files in these batches, in order. Each batch is 40MB or less, and you can make as many uploads as you need.
- Upload 1: landlords-evidence_flat-2-14-albion-road-bristol-bs3-4ab.pdf, E1–E15 (1.6MB)
- 4Tick the confirmations, check the list of files and submit. Files can’t be removed once they’re submitted.
- 5You can post your evidence instead, to The DPS, The Pavilions, Bridgwater Road, Bristol BS99 6AA. DPS doesn’t accept evidence by email or as a link to cloud storage.
Before you submit
- Your evidence must reach DPS by 11:59:59pm on the deadline day. Uploads close after that.
- DPS asks for photos to be signed, or covered by a signed statement of the dates they were taken. Print the photo dates page, sign it and upload it with the exhibits.
Not in the pack
- DPS dispute notification.pdfThe scheme’s notification and the tenant’s response, which are the dispute’s own papers.